I worked with ARC Roofing to design details, fabricate, and install the copper tiles façade system for architects Breather Architecture for the recent renovation of Paramount Hotel.
Through a workflow of small definitions that have been to allow to control the pattern distribution, the mega panels division, the dimensions, and the finishing of all the 3808 copper tiles. The control of the façade by a single spline and a waterfall model allowed to adjust quickly and easily the model to achieve the design intent and the request on-site.
This organisation permitted to maintain a high level of accuracy and delivered all the documentation for fabrication and installation of 332 sqm copper tiles, 833 linear meters of SHS, and top-hat in less than one week.

Location — Sydney
Year — 2017
Digital Fabrication — AR-MA
Developer — Calida
Architect — Breathe Architecture
Roofing consultant — ARC Roofing

AR-MA team — Mirco Bianchini
Tools Rhino, GH, Revit
Photos, videos, diagrams AR-MA
Links Archdaily