AR-MA was engaged by CPB, the builder, at a critical point in the project due to the necessity to open the pedestrian.
The AR-MA team took just four months to code, design, and model over 10,500 drawings for the highly bespoke Wynyard Walk fit-out.
This included fabrication-ready detailing for every one of 2000 perforated, folded stainless steel ceiling panels and 600 light coves, integration of lighting and numerous services, coordination with the architect’s design, sound and light system, and structural elements.

This project was my second big project from I joined AR-MA, I was responsible for the creation of the skeleton model, consumed by 3dExperiance for all the levels of the project, and all the fabrication workflow of the balustrades.

Location — Sydney
Year — 2016
Digital Fabrication — AR-MA
Developer — CPB contractors
Architect — Woods Bagot
Panel fabrication — Stoddart

AR-MA team — Guido Maciocci (Team leader), Massimiliano Manno, Mirco Bianchini
Tools Rhino, GH, 3dExperiance, EKL
Photos, screenshots AR-MA
Links Archdaily